Newface
Well-Known Member
- Thread starter
- #1
Notes:
• Production Weeks: 12/30 - 1/27.
• Main Commit.
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black exterior paint.
Limited Availability:
- 99F - 5.0L Ti-VCT V8 Engine with Stop/Start System
Very Limited to Exhausted:
- 99H - 2.3L EcoBoost Engine with Stop/Start System
• Production Weeks: 12/30 - 1/27.
• Main Commit.
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black exterior paint.
Limited Availability:

Very Limited to Exhausted:

Sponsored