Newface
Well-Known Member
- Thread starter
- #1
Notes:
• Production Weeks: 2/3 - 2/17
• Main Commit.
• Job#1 Balance Out Scheduling
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black
• Limited Availability:
- 99F - 5.0L Ti-VCT V8 Engine with Stop/Start System.
- 99H - 2.3L EcoBoost Engine with Stop/Start System.
• Very Limited to Exhausted:
- 64F - 18" X 8" Machined-face Aluminum.
- TCF - Tires 235/50 ZR 18 BSW All-Season (A/S).
• Production Weeks: 2/3 - 2/17
• Main Commit.
• Job#1 Balance Out Scheduling
- The Dark Horse Handling Package (67P) won't be available until April 2025.
- The Mustang Nite Pony Package (60G) with the Black Painted Roof is available only for retail scheduling. For stock orders, the vehicle must have black
• Limited Availability:


• Very Limited to Exhausted:


Sponsored