• Welcome to Mustang7G!

    If you're joining us from Mustang6G, then you may already have an account here!

    As long as you were registered on Mustang6G as of March 10, 2021 or earlier, then you can simply login here with the same username and password!

2024 Mustang Scheduling This Week (7/25/24) for Production Weeks 9/2 - 9/23

Airtrade

Well-Known Member
Joined
Apr 6, 2024
Threads
4
Messages
81
Reaction score
55
Location
SW Ohio
Vehicle(s)
24 Mustang GT
if you mean last several months by recently, me! So you're saying you removed Nite Pony and your production date moved up to next week?
No, I did not have a date or a vin until I changed my order. My scheduled week is 9/16.
I just wondered if anyone recieved a vin while NPP is under exhausted constraint.
Sponsored

 

Lakersfreak

Well-Known Member
Joined
Apr 16, 2024
Threads
31
Messages
265
Reaction score
163
Location
Los Angeles
Vehicle(s)
24 Mustang GT
No, I did not have a date or a vin until I changed my order. My scheduled week is 9/16.
I just wondered if anyone recieved a vin while NPP is under exhausted constraint.
I got my VIN two weeks after ordering in April.
 

AstroNut

Well-Known Member
Joined
Jul 1, 2024
Threads
5
Messages
45
Reaction score
34
Location
El Segundo, CA
Vehicle(s)
2006 Toyota 4Runner, Class A Motorhome
For those that have more history in this forum, is there some explanation of how to interpret the scheduling report? I have only seen partial explanations here and there.
 

VTX CHF

Well-Known Member
Joined
Apr 18, 2024
Threads
1
Messages
90
Reaction score
59
Location
Illinois
Vehicle(s)
Explorer ST/ Z4M
Having a color other than black you have a contrast, but with black the mirror caps, roof, spoiler are already black so you get the darken head lights. I was surprised to see the interior chrome doesn’t get darkened with the pkg.
 

Airtrade

Well-Known Member
Joined
Apr 6, 2024
Threads
4
Messages
81
Reaction score
55
Location
SW Ohio
Vehicle(s)
24 Mustang GT
Having a color other than black you have a contrast, but with black the mirror caps, roof, spoiler are already black so you get the darken head lights. I was surprised to see the interior chrome doesn’t get darkened with the pkg.
I was surprised there wasn't a lower cost if already painting the car black. I wanted the dark headlights, black badges and wheels. The headlights alone would cost more than the package.
 


roadpilot

Well-Known Member
Joined
Feb 12, 2024
Threads
8
Messages
3,133
Reaction score
3,392
Location
Michigan
Vehicle(s)
24 Dark Horse, 21 F150 Platinum, 16 ATS4, 14 LTZ
For those that have more history in this forum, is there some explanation of how to interpret the scheduling report? I have only seen partial explanations here and there.
What is a 'scheduling report'?
 

AstroNut

Well-Known Member
Joined
Jul 1, 2024
Threads
5
Messages
45
Reaction score
34
Location
El Segundo, CA
Vehicle(s)
2006 Toyota 4Runner, Class A Motorhome
The document at the beginning of this thread.

2024 Mustang Scheduling This Week (7/25/24) for Production Weeks 9/2 - 9/23
 

roadpilot

Well-Known Member
Joined
Feb 12, 2024
Threads
8
Messages
3,133
Reaction score
3,392
Location
Michigan
Vehicle(s)
24 Dark Horse, 21 F150 Platinum, 16 ATS4, 14 LTZ
The document at the beginning of this thread.

2024 Mustang Scheduling This Week (7/25/24) for Production Weeks 9/2 - 9/23
ROTF! Yea, that. Boy, did I have a brain fart.
 

AstroNut

Well-Known Member
Joined
Jul 1, 2024
Threads
5
Messages
45
Reaction score
34
Location
El Segundo, CA
Vehicle(s)
2006 Toyota 4Runner, Class A Motorhome
@roadpilot, now that we got that straight, do you have any suggestions or information about how to interpret what the various things mean? Limited and Exhausted availability? My GT is scheduled during the weeks of 9-9 or 9-16. The email says 9-16, the tracker says 9-9. I expect it will probably be later than that given what I have been seeing with production schedule delays. Good to see the plant up and running again. I think the OP document about production schedule info is helpful, I just want to know what some of it means. Thanks,
 

Airtrade

Well-Known Member
Joined
Apr 6, 2024
Threads
4
Messages
81
Reaction score
55
Location
SW Ohio
Vehicle(s)
24 Mustang GT
@roadpilot, now that we got that straight, do you have any suggestions or information about how to interpret what the various things mean? Limited and Exhausted availability? My GT is scheduled during the weeks of 9-9 or 9-16. The email says 9-16, the tracker says 9-9. I expect it will probably be later than that given what I have been seeing with production schedule delays. Good to see the plant up and running again. I think the OP document about production schedule info is helpful, I just want to know what some of it means. Thanks,
From reading lots of posts and searches it's more of a suggestion for dealers.

If a part is limited you are less likely to get scheduled.
If exhausted even less Likely.

Although I have seen a order a week before mine and a week after get scheduled and a VIN with the Nite Pony package all while being limited. I changed my color to shadow black and finally recieved a schedule and vin. Even still with the 99f engine being listed as exhausted.

If you have a vin and schedule you should be in good shape save for the build week moving a bit.
 

JJZ_109

Well-Known Member
Joined
Jul 16, 2024
Threads
2
Messages
86
Reaction score
87
Location
Colorado
Website
www.rjsamplification.com
Vehicle(s)
2024 Mustang GT premium (ordered)
No, I did not have a date or a vin until I changed my order. My scheduled week is 9/16.
I just wondered if anyone recieved a vin while NPP is under exhausted constraint.
I placed my order 7-6-24 already have my Vin and production date of 9-9-24. I ordered Nite Pony Package, Magna ride, Performance pack, 10 speed auto, 401a, and Active Valve Exhaust.
 

Airtrade

Well-Known Member
Joined
Apr 6, 2024
Threads
4
Messages
81
Reaction score
55
Location
SW Ohio
Vehicle(s)
24 Mustang GT
I placed my order 7-6-24 already have my Vin and production date of 9-9-24. I ordered Nite Pony Package, Magna ride, Performance pack, 10 speed auto, 401a, and Active Valve Exhaust.
Did you order a color other than shadow black? The seperate roof painting seems to be the issue.
 

Lakersfreak

Well-Known Member
Joined
Apr 16, 2024
Threads
31
Messages
265
Reaction score
163
Location
Los Angeles
Vehicle(s)
24 Mustang GT
so if there are several exhausted options in my order, and production week is scheduled for this time period, what does that mean exactly? Will I get pushed back again? I've had my VIN since mid May.
 

PonyExpress

Well-Known Member
Joined
Apr 22, 2014
Threads
0
Messages
108
Reaction score
12
Location
Charlotte, NC
Vehicle(s)
2015 Kona Blue GT/LE, 2024 Explorer ST
Question on the order tracker…scheduled for week of 8/5, blend 8/6. Moved to Production as of 8/8. Moved to secondary status = Produced on 8/12, then flipped to Released to Body Company 8/15.

Assuming they moved it too soon and it still needs something installed before final QC and shipping?

Asking as I was quoted an ETA of 8/29-9/6 which I never took seriously.
Sponsored

 
 








Top